Elevation drawings may also be required, check with Building Official for requirements. A cross sectional view indicating all materials and installation specs from footing to roof line. All fire, smoke, CO2 and other related safety and fire equipment to be shown. Indicate type, location, thickness and R-value of all insulation and submit a compliant REScheck, if applicable. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |